Enhancement cost calculator

Choose the right source context and target, then calculate. Example inputs demonstrate the model; save explicitly to keep your own plan.

Before you spend: check your assumptions and data source

Check the origin of your inputs: initial example values demonstrate the model; manual values are your own assumptions; community Global rates are an extracted reference; official Korean presets describe their stated region and snapshot. Selecting Global does not verify your manual entries.

Enter the live currency fee plus any materials you intend to buy, using one currency unit throughout. If your attempt cost already includes those materials, do not add them again. Keep a separate note of the item system, stage, source date and failure consequence; use a descriptive name when saving the plan. Required blank costs pause the estimate until completed.

Estimates depend on the selected model and your costs. Record the inputs, inspect correction behavior and keep a stopping budget.

Review this action for my checklistChoose my next step

Estimate the long-run cost of reaching a target enhancement level and compare protection against absorbing the failure penalty.

Verified presets, clearly scoped. Load the official Korean-service disclosure as a regional reference, or edit every value yourself. Korean values are not presented as confirmed Global-service values.

Your enhancement plan

Quick range

1. Quick estimate

Enter the same verified rate and cost for each stage in this range. Results appear after calculation. An empty cost means unknown, not free. Enter 0 explicitly for a confirmed zero cost. Failure recovery is required below 100% success; protection remains optional. Open advanced mode when stages differ.

Example values are illustrative only—not verified AION 2 global data.
Optional: load regional reference data

Load verified data

Choose the exact equipment profile, then calculate without filling a table.

Official source

Regional reference: verify the displayed values in the Global client before spending. The source includes base success rate, failure correction, Kinah, materials, and failure penalty by equipment profile.

Edit every stage individually Advanced mode
Stage Success rate Failure bonus Attempt cost Failure recovery Protection / attempt Protection break-even

Compare enhancement strategies

Same equipment and target, three ways to handle failure. Change your inputs above to compare costs and budget risk.

Enter valid stage inputs to compare strategies.

What does budget coverage mean?

The percentage of simulated runs that reached the target within your entered cost budget. It is an estimate under these assumptions, not a guarantee or a change to the game's success rate. Materials are separate from currency costs. Missing attempt costs stop the estimate. For stages below 100% success, failure recovery must also be entered. Enter 0 explicitly only when you have confirmed there is no monetary recovery cost. Protection assumes that it removes the entered failure recovery penalty without changing success rates.

Optional Global rate reference

Community extraction reports these rates for normal Unique enhancement in build 0.0.4387.0: +0–10 at 100%; then 65%, 50%, 35%, 25%, 20%, with +5 percentage points per failure. This is not a verified equipment cost preset and does not cover amplified enhancement or Potential.

Loading replaces visible assumptions, sets +0 to +15, and clears costs. Enter matching attempt costs and failure recovery values before estimates appear. For downgrade or destruction, a simple recovery-cost estimate is not an exact chain model.

Original rate table · Reference data

Current Global preset research: optional community rates are available above. Complete item costs and failure rules still need verification. Review the remaining evidence.

Help verify Global enhancement data

Send a clear live-client screenshot with region, equipment type, grade, item level, enhancement stage, success rate, Kinah cost, materials, and failure behavior. Submitted values are reviewed before they become defaults.

Global data status: awaiting verified live-client submissions.

How to read the estimate before spending

Expected cost is a long-run average, not the price of a single upgrade session. Typical budget (50%) is the median simulated cost. Safer budget (90%) covers about nine out of ten simulated runs under the entered assumptions; some runs still cost more.

Check the selected data region and status, success rate, failure correction, and recovery costs. Use the same currency unit for all cost fields. Materials are listed separately; include their purchase cost yourself if needed. A blank protection cost means protection cannot be compared. Set a personal spending limit before starting.

Illustrative examples demonstrate the tool. Edited inputs are your assumptions. Neither is verified Global game data. The simulation uses 6,000 runs and limits failures per stage; unusually low success rates can make tail estimates less reliable.

Transparent method

What the calculator assumes

Attempts

Rate after failures = base rate + correction × failures

A zero correction keeps the familiar independent-attempt model. Official presets apply the disclosed per-failure correction and cap success at 100%.

Without protection

attempt cost ÷ rate + recovery × failures

Failure recovery can represent downgrade repair, replacement materials, or any other expected loss.

With protection

(attempt cost + protection) ÷ rate

Protection is assumed to remove the entered failure recovery cost. Set it blank if protection is unavailable.

Want to audit the model? Read AION 2 enhancement mechanics and math explained →

Choose the matching enhancement system

The community extraction separates normal enhancement, amplification and Potential. Do not reuse normal Unique rates for the other systems. Equipment costs and failure consequences remain unverified.

Inspect the reported failure correction

This small reference shows the normal Unique chance after consecutive failures. It does not estimate spending. Verify when the bonus resets in your client before applying it to a session.

Model: min(100%, base + 5 percentage points × failures). A modeled 100% chance is conditional on the correction rule; it does not establish an independent guaranteed-attempt rule. Failure at the same level may need zero recovery; downgrade and destruction need rebuilding the item, which this fixed recovery-cost model only approximates.

Still have a question?

Ask the community with this guide or tool as context.

Ask about this page → · Search answers

Personal tools · automatic cloud sync

Saved tools sync privately after sign-in. Loading sync status…